Project Value - Over $10M

 

PROJECT NAME DESCRIPTION OF WORKS
Building the Education Revolution
Numerous School Buildings constructed over the following Central and Western NSW Schools consisting of Canteens, Shade Shelters, Halls and Cola’s. Each project ranged in price between $185,000 and $2.2 million. Total BER project value $17 million.
  • South Dubbo Primary
  • Tottenham Central School
  • Forbes Public School
  • Forbes North Public School
  • Parkes East Public School
  • Cobar Public School
  • Hermidale Public School
  • Narromine Public School
  • Nyngan Public School
  • Trangie Central School
  • Warren Central School
  • Bourke Public School
  • Bourke & Walgett School of Distance Education
  • Orana Heights Public School

Quirindi Nursing Home Construction of Dementia (High and Low Care) Aged Care Units. New Administration and Conference Facilities and Staff Resting Quarters. Internal fit out complete with new commercial grade Kitchen and Laundry
Dubbo Regional Theatre & Convention Centre Construction Commenced on The Dubbo Regional Tiered Theatre in September 2008 for the Dubbo City Council with the building being completed in March 2010. The building consists of a full size 26 metre high flytower with a 500 seat tiered theatre. The building was completed on time,  under budget and to a high quality standard. 

Features include

  • Full size fly tower with a complete stage theatre system.
  • 500 seat tiered seating area which incorporates the orchestra pit and state of the art stage lift.
  • 1200m² of change room and technical areas built over two levels.
  • 900m² of Front of house areas incorporating a ticket office and Bar area.
  • Removable stage.
  • Building Management system that controls all Hydraulic, Mechanical and electrical systems.

Building facts

  • The theatre is the only one in Australia to incorporate a full size flytower using steel frame and tilt panel construction.
  • The building foundations are 16 metres below street level with the flytower reaching 26 metres into the skyline.
  • A total of 3000m³ of concrete and 15 km of electrical cabling went into the construction of the theatre.
  • The Theatre achieved a Nil Lost time injury rate(LITFR).

The theatre is the largest most technical project completed by the company to date which continues to receive rave reviews from both the community and people abroad.